Project Info
Woolfords Wind Farm is a consented three-turbine wind farm located on approximately 27.5 hectares of open moorland used for sheep and cattle grazing.
The wind farm is expected to have an installed capacity of approximately 20MW, generating around 65,353 MWh of renewable electricity each year, enough to power the equivalent of approximately 16,715 Scottish homes.*
Since the original planning permission was granted, turbine technology has continued to advance. Larger, more efficient turbine models have become available, while some of the previously available lower tip height models are no longer being manufactured.
Increasing the maximum permitted tip height from 180 metres to 200 metres will provide greater flexibility in turbine selection, enabling the project to make better use of the available wind resource and generate more low-carbon electricity.
The planning application was submitted to South Lanarkshire Council on Wednesday 24 June 2026 and validated on Monday 13 July 2026.
You can view the full planning application on this website or via the South Lanarkshire Planning Portal using reference P/26/0789.
Based on an installed capacity of approx. 20MW, Woolfords Wind Turbines will have the potential to generate around 70,000 megawatt hours (MWh) of electricity annually, sufficient to meet the needs of around 19,500 homes, while offsetting approximately 30,000 tonnes of CO2 per year*.
*Calculation correct as of October 2021 based on RenewableUK methodology, utilising the most recent statistics from the Department of Business, Energy and Industrial Strategy (BEIS) (https://www.renewableuk.com/page/UKWEDExplained)